蜜桃臀av_粉嫩av一区二区三区在线_香港aa三级久久三级_亚洲精品在线播放_国产高潮流白浆喷水在线观看_多人调教到高潮失禁h重口文

Welcome to Aigre?

more>>Industry Overview

News

Approval Granted for 15.4 Billion Intercity Railway Project!
addtime:2022-07-29click:359


Zhejiang Rutong Suhu Intercity Railway Co., Ltd. announced on the 15th that recently, the land pre-approval for the Rudong-Nantong-Suzhou-to-Huzhou Intercity Railway (Nanxun-to-Changxing Section) has been approved by the Ministry of Natural Resources.

Land pre-approval is one of the important preconditions for the approval of the project's engineering feasibility study, and it requires approval at the municipal, provincial, and national levels. The smooth approval of the land pre-approval is of great significance for accelerating the approval of the project's engineering feasibility study.

微信圖片_20220729135610.png

According to the "Post-Approval Announcement of Land Pre-Approval and Planning Site Selection Permit for the Rudong-Nantong-Suzhou-to-Huzhou Intercity Railway (Nanxun-to-Changxing Section)" released on the 18th:

微信圖片_20220729135628.jpg


Project Location: Nanxun District, Wuxing District, South Taihu Lake New Area, and Changxing County, Huzhou City

Pre-approval Status: The total land area is 130.7180 hectares, with the current land use status being 95.5679 hectares of agricultural land (including 34.7869 hectares of cultivated land, with 29.4312 hectares of permanent basic farmland; and 49.7917 hectares of standard farmland), 19.3221 hectares of construction land, and 15.8280 hectares of unused land.

微信圖片_20220729140435.png

Project Overview

The Huzhou section of the Rudong-Nantong-Suzhou-to-Huzhou Intercity Railway (Nanxun-to-Changxing Section) is located within the territory of Huzhou City. It is an important part of the multi-level rail transit system in the Yangtze River Delta region's metropolitan area intercity railway network and also an important part of the intercity railway network in the Huan Taihu Lake Metropolitan Area.

微信圖片_20220729140454.png

According to the plan, the Rudong-Nantong-Suzhou-to-Huzhou Intercity Railway (Nanxun-to-Changxing Section) starts from Nanxun Station (interchanging with the under-construction Shanghai-Suzhou-Huzhou Railway at Nanxun Station) and terminates at Changxing Station (interchanging with the Nanjing-Hangzhou Passenger Dedicated Line at Changxing Station), with a reserved line condition for extension north to Yixing at Changxing Station.

The entire line is 65.24 km long (including a 4.596 km co-linear section with the Water Town Tourism Intercity Railway from the Jiangsu-Zhejiang provincial boundary to Nanxun High-Speed Railway Station), with a total of 11 stations: Nanxun Station, Yangnan Station, Zhili Station, Balidian Station, Qiaonan Village Station, Yinshan Second Road Station, Yinshan First Road Station, Taihu Road Station, Tuying Station, Hongqiao Town Station, and Changxing Station. The railway is classified as a metropolitan area intercity railway with double main lines and a target speed of 160 km/h. The total investment is approximately 26.861 billion yuan, with direct engineering costs of approximately 15.483 billion yuan.


主站蜘蛛池模板: 确山县| 舟山市| 莲花县| 东港市| 南陵县| 集贤县| 乌兰浩特市| 孟津县| 兴山县| 莆田市| 彰化市| 资溪县| 新乐市| 边坝县| 洮南市| 南部县| 顺平县| 商河县| 崇左市| 盐池县| 宝应县| 隆昌县| 介休市| 周口市| 西乡县| 林甸县| 庐江县| 犍为县| 鲁甸县| 女性| 宁津县| 梁平县| 牟定县| 普宁市| 广元市| 彭州市| 启东市| 霍州市| 大渡口区| 怀化市| 迁安市|